Difference between revisions of "MitoEAGLE flyer"
From Bioblast
Nirschl Lisa (talk | contribs) |
Nirschl Lisa (talk | contribs) |
||
Line 9: | Line 9: | ||
::::» http://www.mitoglobal.org/index.php/Talk:MitoEAGLE_flyer | ::::» http://www.mitoglobal.org/index.php/Talk:MitoEAGLE_flyer | ||
:::: A decision should be made by end of October, if we want to go ahead with this option. | :::: A decision should be made by end of October, if we want to go ahead with this option. | ||
::::» [[MC | ::::» [[MC MitoEAGLE e-VOTE 02]] | ||
Revision as of 12:18, 19 January 2018
News and Events | Working Groups | Short-Term Scientific Missions | Management Committee | Members |
COST Action CA15203 (2016-2021): MitoEAGLE
Evolution-Age-Gender-Lifestyle-Environment: mitochondrial fitness mapping
MitoEAGLE flyer
Work in progress - Discussion page
2016-10-20 e-VOTE 02
- The production of a flyer/folder and poster for dissemination purposes of our MitoEAGLE project is included in Grant Period 1 with 2,700.- EUR.
- The Core Group discussed a specific offer of Impact Ltd to produce a 4-page flyer/leaflet, to be completed by March 2017 within the limits of our budget (without poster). Details and comments from the Core Group (and from another COST Action) to this offer are summarized here:
- » http://www.mitoglobal.org/index.php/Talk:MitoEAGLE_flyer
- A decision should be made by end of October, if we want to go ahead with this option.
- » MC MitoEAGLE e-VOTE 02
Circular to the Core Group, 2016-10-16
- Production of a flyer for dissemination purposes of our MitoEAGLE project: 2,500.- EUR is included in Grant Period 1.
- I was contacted by the director of the journal ‚Impact‘. Further Email correspondence and a telephone call resulted in a description of how a publication and 4-page flyer or leaflet might be completed by March 2017 within the limits of our budget. The details are summarized here:
- At present, I do not know of any superior alternative. I would greatly appreciate to hearing your oppinion. A decision should be made by end of October, if we want to go ahead with this option.
- This information is sent primarily to the Core Group. Probably we should have a quick e-vote by the Management Committee for a final decision.
- Best wishes,
- Erich